Everglades Agricultural Area A-1 Flow Equalization Basin Project

Construction Cost

$ 2.4 Million

Project consisted of the design of two culvert structures essential for the operation of the equalization basin. Structures consist of approximately 2,700 LF of 10ft diameter Steel reinforced polyethylene pipe anchored to resist complete evacuation while submerged. Design includes connections to concrete pump control structures, existing concrete box culverts, and open channel flow protection. Also includes civil site design for the outflow canal passing under an inflow channel.