Post Construction Condition Survey of Jungle Island Structures

Construction Cost

$ 0

Project consists of the inspection, coordination, evaluation, repair recommendations, and production of final reports for 9 structures and associated roadways and walkways adjacent to the Port of Miami Tunnel.  The detailed post condition survey included interior, exterior, and roofs of the structures with hundreds of well documented photos and HD videos as required by the contractor’s concessionaire agreement.