SR-826 On Ramp to I-75

Construction Cost

$ 3 Million

Lakes’ personnel were responsible for the construction engineering portion of the project for the widening of a multi span three-unit single box girder segmental ramp in Miami Florida.  The project encompassed a single segmental box that had was on a 1000 ft horizontal curve and with spans in the 200 ft range.  Responsible for the complete torsional analysis of the single box, which included time-dependent effects and the design of stability towers.