Indian Creek Bridge Rehabilitation

Construction Cost

$ 2.8 Million

Lakes Engineering was responsible for the design and construction administration of the rehabilitation of the existing bridge over Indian Creek.  Project includes the design and preparation of plans, specifications, environmental permitting, for the proposed rehabilitation of the existing structure built in 1930.  This bridge is the Village’s sole means of ingress/egress between the island and the mainland. Given its age, condition, and cost for replacement the goal of the project is to use innovative preservation strategies and actions to extend its useful life and provide the Village with ample time and opportunity to prepare or its eventual replacement.  Also responsible for coordination with municipality and public involvement.